Monday, 27 May 2019

Balcony Project Week 3

This "weeks" progress has been concerned with the finer details in the steels. especially the staircase. The tricky piece has been to ensure that there is sufficient head clearance at the lower end of the staircase to satisfy building regs. Keeping within the outline of the balcony has forced some rework to use a double turn staircase.






Also arriving this week were some samples for the decking and support materials. In order to have better durability we have chosen to use plastic lumber for the decking substructure from Envirobuild.



This new material is made from recycled plastic waste and can be worked with wood working tools and methods. Having got some 3M samples of 3*1 the feel of the lumber does seem to be a bit different than wood possibly not having quite the same torsional rigidity. This will be fine for the decking support but not sure would work for the main support joists.

Looking further on to the finishing touches we are considering an illuminated handrail which will certainly add some glamour and price.  Something like this picture.


Illumirail | LED Bar Lighting System for Handrail




No comments: